The Trout Habitat Preservation Project (THPP), the first Capitol Improvement Project of the newly formed Brown’s Creek Watershed District (BCWD), was a project designed to alleviate flooding surrounding a large land-locked basin while protecting the temperature sensitive resources of Brown’s Creek. This project was constructed in 2000.
- Trout Habitat Preservation Project – Documenting Success!
- Infiltration Improvement 2008
- THPP Infiltration Monitoring Summary 2017 The objective of this memorandum is to report on the performance of the Trout Habitat Preservation Project (THPP) during the 2017 monitoring season and to report on the annual maintenance activities performed at this site. This was the ninth monitoring season since construction of the infiltration improvements were made in the winter of 2005-2006.
- THPP_Tour_Handout_2022.pdf