How does the project help Brown's Creek?
By working with seven residential landowners in the neighborhood, BCWD installed 9 street-side raingardens to infiltrate 3.86 acre-feet of warm stormwater and to remove 1.3 ton of the total suspended solids and 6.6 pounds of total phosphorous per year from Brown’s Creek. The project was completed in 2015.0
Project Cost
The project cost $91,376.89, including design and construction
Leveraged Clean Water Fund Grants = $45,000 (49%)
Local BCWD tax levy = $46,376.890
Informational Document
Clean Water Story 2013 Project to Benefit Brown's Creek (PDF)
Construction Photos